Announcement Under Regulation 30 (LODR)- Updates (Volume Movement) 1 Oct - IRCON says no announcement or event currently explains the share price or volume movement.
Source: Bse
Infra stocks · Small cap · NSE
Navratna Central Public Sector Enterprise under the Ministry of Railways, involved in infrastructure projects including railways, roads, highways, buildings, and tunnels. Has executed 5,740 TKM Railway Track, 10,669 RKM Railway Electrification, and 7012 KMS Roads and Highways.
full bear SMA stack · SMA20 -9.0% / mo · MACD + · near 52W low · sector -2.7pp vs Nifty 500 (3M)
FPI equity flow was positive in both fortnights, but the sector index is below its 100-session average. View sector evidence
Adjusted completed-session prices, rebased to 100
Weak fundamentals, management evidence is still limited to a financial-only Trust Lite signal, price trend argues for patience, and recent execution is weak.
Fundamental lens: valuation, quality, growth, balance sheet, and cash flow.
Revenue +9.5% · PAT -43.9% YoY
Price trend and sector-relative-strength timing.
Legacy margin-of-safety estimate; the revised evidence label remains in shadow validation.
Financial-only signal; management claim evidence is not sufficient yet.
Fundamentals, quarterly history, margins, returns and balance-sheet evidence
PAT -44% YoY · margin compression · Rev +10% YoY
| Metric | This quarter | YoY | QoQ |
|---|---|---|---|
| Revenue | ₹1,956 Cr | +9.5% | -38.7% |
| EBITDA | ₹192 Cr | -4.0% | -28.1% |
| Operating margin | 10.0% | -100 bps | +200 bps |
| PAT | ₹92 Cr | -43.9% | -51.8% |
| PAT margin | 4.7% | -448 bps | -129 bps |
NDF means not disclosed in the current structured filing feed. It is intentionally not treated as zero.
Updated 20/10/2026
Trend interpretation, Stage 2, relative strength, volume and indicator evidence
Signals are conflicting — long-term trend down. RSI 40. Wait for confirmation.
Mechanical read from the price + indicator series above. Not a recommendation — technical setups can reverse without warning, especially around earnings and macro events.
U-Score 17 · legacy U-Score band OVERVALUED · valuation evidence and comparable companies
Top U-Score contributors and drags from the latest stored fundamentals.
Capital-intensive execution stories need cash-flow and balance-sheet checks alongside valuation.
This shows the stored score trend when snapshots exist, and also compares the latest stored nightly score with a live recompute from current fundamentals and price.
12 stored score snapshots. Latest stored move: +0 points.
Business-comparable peers in Infra — ranked by industry, sub-sector, theme-tag overlap, market cap, and U-Score similarity. Green cells mark the best available peer metric in this table.
Growth engines, risks, management commitments and evidence-backed delivery
Consolidated Q4FY26 Operating Revenue declined 6.5% YoY but grew 50.5% QoQ. PAT decreased 9.6% YoY but surged 91.8% QoQ. For FY26, Operating Revenue fell 15.7% YoY, and PAT dropped 18.7% YoY.
IRCON's Q4FY26 showed strong sequential recovery in operating revenue and PAT, but annual performance for FY26 and Q4 YoY figures reflect significant declines. Despite a robust order book providing future revenue visibility, the current year's revenue contraction and increased finance costs indicate execution challenges and margin pressure.
Latest issuer-disclosed distribution across 3 reported categories.
Allocation of Rs.12.20 lakh Crore in Union Budget 2026.
Announced new Dedicated Freight Corridors connecting Dankuni in the East, to Surat in the West.
Development of 100 PM Gati Shakti Cargo Terminal for multimodal logistics.
Indian Railways to require investment of Rs.35.3 trillion (US$ 545.26 billion) by 2032 for capacity addition and modernization.
Massive Govt. push to the CAPEX by allocation of Rs.12.20 lakh Crore in Union Budget 2026.
Boost from National Infrastructure Prioritization, National Monetization Pipeline and Gati Shakti.
Outlay of INR 2.78 Lakh Crore was announced in Union Budget for Indian Railways.
Outlay of INR 3.10 Lakh Crore has been allocated towards road transport and highways in Union Budget.
Issuer guidance and extracted claims are tracked against later reported outcomes. Treat these as management statements, not IndiaPulse forecasts.
Q4 results show strong sequential momentum (QoQ) after a weaker Q3, indicating project execution pick-up. However, YoY comparison is crucial to assess annual growth trends and seasonal impacts, which show declines.
Order Book of Rs.24,984 crore as on 31.03.2026.
Order book of Rs. 24,984 crore against FY26 consolidated operating revenue of Rs. 9071.1 crore, implying a cover of ~2.75x.
Q4FY26: Rs. 3189 crore (-6.5% YoY, +50.5% QoQ). FY26: Rs. 9071.1 crore (-15.7% YoY).
Q4FY26: 9.0% (up 155 bps YoY, 41 bps QoQ). FY26: 9.4% (up 94 bps YoY).
| Checkpoint | Current evidence | What to verify next |
|---|---|---|
| Order Book Execution | Rs. 9071.1 crore operating revenue in FY26. | Improvement in revenue growth rate and project execution efficiency to convert order book into revenue. |
| Core EBITDA Margins | 9.4% (FY26 Consolidated). | Sustained improvement in core EBITDA margins, especially given the increase in finance costs. |
| Finance Cost | Rs. 350.1 crore (FY26 Consolidated), up 59.8% YoY. | Stabilization or reduction in finance costs, which significantly impacted PBT. |
| Order Inflow | Order book of Rs. 24,984 crore. | New order wins, particularly through competitive bidding, to maintain and grow the order book. |
Verification checkpoints are IndiaPulse research interpretation, not investment advice.
Indian Railways plans to install 30 GW of renewable power capacity by 2029-30 to reduce carbon footprint.
"IR to install 30 GW of renewable power capacity by 2029-30"
Indian Railways plans to install 30 GW of renewable power capacity by 2029-30 to reduce carbon footprint.
"IR to install 30 GW of renewable power capacity by 2029-30"
Indian Railways will require an investment of Rs.35.3 trillion (US$ 545.26 billion) by 2032 for capacity addition and modernization.
"Indian Railways to require investment of Rs.35.3 trillion (US$ 545.26 billion) by 2032"
Indian Railways will require an investment of Rs.35.3 trillion (US$ 545.26 billion) by 2032 for capacity addition and modernization.
"Indian Railways to require investment of Rs.35.3 trillion (US$ 545.26 billion) by 2032"
The Union Budget announced an outlay of INR 2.65 Lakh Crore for Indian Railways.
"Outlay of INR 2.65 Lakh Crore was announced in Union Budget for Indian Railways"
The Union Budget announced an outlay of INR 2.65 Lakh Crore for Indian Railways.
"Outlay of INR 2.65 Lakh Crore was announced in Union Budget for Indian Railways"
The Union Budget 2025 includes a massive government push to CAPEX by allocation of Rs.11.21 lakh Crore.
"Massive Govt. push to the CAPEX by allocation of Rs.11.21 lakh Crore in Union Budget 2025"
The Union Budget 2025 includes a massive government push to CAPEX by allocation of Rs.11.21 lakh Crore.
"Massive Govt. push to the CAPEX by allocation of Rs.11.21 lakh Crore in Union Budget 2025"
Trust asks: does management behaviour match later outcomes? Higher is better, but confidence and evidence depth matter as much as the number.
Limited evidence: Claim history is still being built. It ranks around the 6th percentile of the scored universe and 12th percentile within Infra. Main check: results consistency is weak at 15/100.
This is a financial-behaviour screen, not a claim-tested management reliability verdict.
Financial behaviour is scored, but management claims do not yet have enough outcome checks.
overall median 67 · Infra: 12th pctile, median 64 · Small: 7th pctile, median 66
98 documents have extracted text, but claim history is not strong enough yet.
4 claims extracted · No contradicted claim yet
Read Trust alongside U-Score, result consistency, and technical trend. A cheap stock with weak Trust needs a larger margin of safety; a high Trust score does not make an expensive stock attractive by itself.
Read low sub-scores as due-diligence warnings, not automatic sell signals.
Trust Lite uses financial behaviour only. Prefer claim-tested Trust when enough concall claims have later outcomes.
Latest exchange and company disclosures found within the past two years.
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse