Announcement under Regulation 30 (LODR)-Credit Rating 16 Oct - Crisil ESG Ratings assigned PNC Infratech an ESG score of 53.
Source: Bse
Infra stocks · Micro cap · NSE
PNC Infratech is an Indian infrastructure company with 25+ years experience, executing roads, highways, water supply, irrigation, railways, airports, and mining projects across 16 states. It operates on EPC, HAM, and BOT models, with in-house design, construction, and equipment capabilities.
SMA20 -22.3% / mo · MACD + · near 52W low · sector -2.7pp vs Nifty 500 (3M)
FPI equity flow was positive in both fortnights, but the sector index is below its 100-session average. View sector evidence
Adjusted completed-session prices, rebased to 100
Mixed fundamentals, management evidence is still limited to a financial-only Trust Lite signal, price trend argues for patience, and recent execution is weak.
Fundamental lens: valuation, quality, growth, balance sheet, and cash flow.
Revenue +18.6% · PAT -23.0% YoY
Price trend and sector-relative-strength timing.
Legacy margin-of-safety estimate; the revised evidence label remains in shadow validation.
Financial-only signal; management claim evidence is not sufficient yet.
Fundamentals, quarterly history, margins, returns and balance-sheet evidence
PAT -23% YoY · Rev +19% YoY · margin expansion
| Metric | This quarter | YoY | QoQ |
|---|---|---|---|
| Revenue | ₹1,688 Cr | +18.6% | +4.4% |
| EBITDA | ₹524 Cr | +42.8% | +89.2% |
| Operating margin | 31.0% | +500 bps | +1400 bps |
| PAT | ₹332 Cr | -23.0% | +207.4% |
| PAT margin | 19.7% | -1062 bps | +1299 bps |
NDF means not disclosed in the current structured filing feed. It is intentionally not treated as zero.
Updated 20/10/2026
Trend interpretation, Stage 2, relative strength, volume and indicator evidence
Signals are conflicting — long-term trend down. RSI 43. Wait for confirmation.
Mechanical read from the price + indicator series above. Not a recommendation — technical setups can reverse without warning, especially around earnings and macro events.
U-Score 45 · legacy U-Score band WATCHLIST · valuation evidence and comparable companies
Top U-Score contributors and drags from the latest stored fundamentals.
Capital-intensive execution stories need cash-flow and balance-sheet checks alongside valuation.
This shows the stored score trend when snapshots exist, and also compares the latest stored nightly score with a live recompute from current fundamentals and price.
12 stored score snapshots. Latest stored move: +0 points.
Business-comparable peers in Infra — ranked by industry, sub-sector, theme-tag overlap, market cap, and U-Score similarity. Green cells mark the best available peer metric in this table.
Growth engines, risks, management commitments and evidence-backed delivery
PNC Infratech reported strong Q1 FY27 standalone results with Total Revenue up 34% YoY to Rs. 1,518 Crs, EBITDA up 167% to Rs. 375 Crs, and PAT up 235% to Rs. 271 Crs. EBITDA margin expanded significantly by 1,230 bps to 24.7%.
The company delivered robust Q1 FY27 standalone financial performance, driven by strong revenue growth and significant margin expansion. New order wins and a healthy order book provide visibility, while debt metrics remain stable. Execution of new projects and working capital management are key.
Latest issuer-disclosed distribution across 3 reported categories.
Entered Mining and Solar-BESS projects, with a combined diversification portfolio of ~Rs. 4,957 Crs (Solar not in orderbook).
Secured multiple new EPC road and airport projects in Q1 FY27, adding significant value to the order book.
Management aims to increase presence in BOT, OMT & HAM projects by leveraging technical and financial credentials.
Improve performance and competitiveness through investments in modern equipment for cost-effective execution.
Strengthening of in-house execution team with engineers and investments in machinery to augment and upgrade capabilities.
Present Capex will enable the company to achieve a Turnover of Rs. 8,000-10,000 Crs.
Received Completion Certificate for Singraur Uphar - Baranpur Kadipur Ichauli HAM project and Provisional Completion Certificate for Kanpur Lucknow Expressway HAM project.
Long term bank facilities rated CARE AA+ (Stable) and Short term bank facilities rated CARE A1+.
6 HAM projects are operational, with 5 under construction and 2 with signed concession agreements.
Received Rs. 235 Crs arbitration award, improving liquidity and financial position.
Issuer guidance and extracted claims are tracked against later reported outcomes. Treat these as management statements, not IndiaPulse forecasts.
The investor presentation explicitly compares Q1 FY27 financial results against Q1 FY26, indicating a year-over-year comparison is the primary basis for assessing performance.
Rs. 1,518 Crs in Q1 FY27, +34% YoY from Rs. 1,136 Crs in Q1 FY26.
Rs. 375 Crs in Q1 FY27, +167% YoY from Rs. 141 Crs in Q1 FY26.
24.7% in Q1 FY27, +1,230 bps YoY from 12.4% in Q1 FY26.
Rs. 271 Crs in Q1 FY27, +235% YoY from Rs. 81 Crs in Q1 FY26.
Maintain strategic alliances with companies for synergy, entering project-specific JVs or sub-contracting relationships.
Expand presence in water supply, irrigation, railways, metro rail, renewable energy, storage systems, industrial area development, and Coalfields.
Fund Based Limits of Rs. 1,000 Crs and Non-Fund Based Limits of Rs. 5,000 Crs will enable execution and bidding for larger projects.
| Checkpoint | Current evidence | What to verify next |
|---|---|---|
| Order Book Execution | Rs. 15,670 Crs as of June 30, 2026. | Timely execution and revenue conversion from the substantial order book, especially new HAM and EPC projects. |
| Working Capital Management | Net Working Capital Days at 110 as of June 2026. | Maintenance or improvement in working capital days, given the nature of infrastructure projects. |
| Equity Requirement for HAM Projects | Balance equity to be invested is Rs. 436 Crs (Rs. 226 Crs in 9m FY27, Rs. 210 Crs in FY28). | Timely funding and deployment of equity for HAM projects to ensure project progress. |
| Future Order Book Additions | LOAs for Barabanki to Mustafabad HAM (Rs. 1,728 Crs) and Mustafabad to Biswariya HAM (Rs. 1,755 Crs) were won post Q1 FY27. | Formal inclusion of these significant HAM projects into the reported order book and their appointed dates. |
Verification checkpoints are IndiaPulse research interpretation, not investment advice.
Trust asks: does management behaviour match later outcomes? Higher is better, but confidence and evidence depth matter as much as the number.
Limited evidence: Claim history is still being built. It ranks around the 52nd percentile of the scored universe and 57th percentile within Infra. Main check: results consistency is weak at 38/100.
This is a financial-behaviour screen, not a claim-tested management reliability verdict.
Financial behaviour is scored, but management claims do not yet have enough outcome checks.
overall median 67 · Infra: 57th pctile, median 64 · Micro: 32nd pctile, median 73
124 documents have extracted text, but claim history is not strong enough yet.
0 claims extracted · No contradicted claim yet
Read Trust alongside U-Score, result consistency, and technical trend. A cheap stock with weak Trust needs a larger margin of safety; a high Trust score does not make an expensive stock attractive by itself.
Read low sub-scores as due-diligence warnings, not automatic sell signals.
Trust Lite uses financial behaviour only. Prefer claim-tested Trust when enough concall claims have later outcomes.
Latest exchange and company disclosures found within the past two years.
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse