Skip to content

Power Grid Corporation of India Limited (POWERGRID)

Large Cap

Power stocks · Large cap · NSE

Power Grid Corporation of India Limited (POWERGRID) is India's central transmission utility, owning and operating a vast inter-state transmission system. It also provides consultancy and telecom services. A government-owned entity, it holds a significant market share in transmission projects, including those under the Tariff Based Competitive Bidding (TBCB) regime.

₹247.05
-3.30 · -1.32%
Market cap ₹2,32,283 Cr
Data qualityFresh enough for analysisQuote updated 21 Oct, 01:15 pm IST
Details
Quote21 Oct, 01:15 pm IST
Base fundamentals14 Oct 2026 · screener
Latest result06 Aug, 04:07 am IST
Score21 Oct, 04:30 am IST · v4.3-runtime-valuation
Tags15 Aug 2026
Coverage14/14 · 100%
Valuation2026-07-20 · Rf 6.8% · Power P/E 16.8 (n=92)
Technical timing lens

Trend score and candlestick chart

18Strong Bear

full bear SMA stack · SMA20 -3.7% / mo · MACD − · near 52W low

Stock trend: 18
Sector RS: —
Power FPI tailwindNot confirmed

Latest mapped FPI equity flow was not positive. View sector evidence

Technical chart

POWERGRIDD candles · FIT view-22.6%TODAY · PROVISIONAL
Latest price ₹247.05 on 2026-10-21

Today's candle is provisional from the latest intraday quote; completed-candle scans remain unchanged.

Bar
-2.5%
RSI
35
MACD hist
-0.23
52W pos
3%
Visible chart range
Candle interval
2026-10-21O ₹253.50H ₹253.60L ₹246.95C ₹247.05Vol 69.9L shIntraday candle
₹240.69₹262.48₹284.27₹306.07₹327.8652H52L₹247.052026-032026-06VolRSIMACD2026-042026-062026-082026-092026-11
Up bar
Down bar
EMA 20
EMA 50
Volume + 20D avg
Result date
RSI(14)
MACD / signal
Market context

Relative performance and chart statistics

Adjusted completed-session prices, rebased to 100

POWERGRIDNifty PowerNifty 500
-17%-10%-3%+4%20 Jul1 Sept19 Oct19 Oct 2026POWERGRID -13.3%Nifty Power -13.0%Nifty 500 -5.6%
POWERGRID
-13.3%
Nifty 500
-5.6%
Nifty Power
-13.0%
Vs Nifty 500
-7.7 pp
Chart stats
19 Oct 2026
From 52W high
-23.0%
₹325
52W range position
7%
₹244.7 - ₹325
ATR (14)
2.0%
₹5.1
Volume vs 20D
0.85x
Latest completed session
Avg traded value
₹256 Cr
20-session average
20D price channel
₹244.7 - ₹270.9
22.6% annualized volatility
Research snapshot

What the evidence says now

Weak fundamentals, management evidence is still limited to a financial-only Trust Lite signal, price trend argues for patience, and recent execution is mixed.

Suggested next step
Research, do not rush
The evidence is not strongly aligned. Compare peers and wait for a cleaner setup.
U-Score
Legacy · WATCHLIST
38

Fundamental lens: valuation, quality, growth, balance sheet, and cash flow.

Latest result
Bad
0

Revenue +2.7% · PAT -0.9% YoY

Technical
Strong Bear
18

Price trend and sector-relative-strength timing.

Valuation
Legacy model
-47.7%

Legacy margin-of-safety estimate; the revised evidence label remains in shadow validation.

Trust
Limited evidence
64

Financial-only signal; management claim evidence is not sufficient yet.

Financials

Fundamentals, quarterly history, margins, returns and balance-sheet evidence

Latest result

Quarter ended 30 Jun 2026

Bad · 0/100

PAT -1% YoY · Rev +3% YoY · margin expansion

Filed 05 Aug 2026
Open results browser →
MetricThis quarterYoYQoQ
Revenue₹11,497 Cr+2.7%-1.4%
EBITDA₹9,430 Cr+3.6%+77.8%
Operating margin82.0%+100 bps+3700 bps
PAT₹3,598 Cr-0.9%-20.9%
PAT margin31.3%-113 bps-767 bps

NDF means not disclosed in the current structured filing feed. It is intentionally not treated as zero.

Fundamentals

Valuation

P/E
14.60
P/B
2.31
EV/EBITDA
8.02
Market Cap
232283.00Cr

Profitability

ROE
15.30%
ROCE
9.10%
ROA
5.39%
Dividend Y
3.61%

Growth (CAGR)

Revenue 5Y
3.00%
EPS 5Y
3.00%
Revenue 3Y
1.00%
EPS 3Y
-2.00%

Balance Sheet

Debt/Equity
1.47
Interest Coverage
4.03×
Altman Z
1.82
Book Value
108.00

Cash Flow

FCF Yield
2.36%
FCF Positive Y
8/5
OCF
40935.00 Cr
EPS TTM
17.09

Shareholding

Promoter Hold
51.34%
Promoter Pledge
0.00%
Momentum 52W
6%

Financial History

Updated 19/10/2026

Revenue

₹ Cr
Latest: 46.7k+2.1% vs prev
047kMar 2017: 25.7kMar 2018: 30.0kMar 2019: 35.1kMar 2020: 37.7kMar 2021: 39.6kMar 2022: 41.6kMar 2023: 45.6kMar 2024: 45.8kMar 2025: 45.8kMar 2026: 46.7kFY17FY18FY19FY20FY21FY22FY23FY24FY25FY26

Net Profit

₹ Cr
Latest: 15.9k+2.6% vs prev
017kMar 2017: 7,451Mar 2018: 8,204Mar 2019: 10.0kMar 2020: 11.1kMar 2021: 12.0kMar 2022: 16.8kMar 2023: 15.4kMar 2024: 15.6kMar 2025: 15.5kMar 2026: 15.9kFY17FY18FY19FY20FY21FY22FY23FY24FY25FY26

Return on Equity

%
Latest: 15.8-5.4% vs prev
022.1Mar 2017: 14.9%Mar 2018: 15.1%Mar 2019: 17.0%Mar 2020: 17.1%Mar 2021: 17.2%Mar 2022: 22.1%Mar 2023: 18.6%Mar 2024: 17.9%Mar 2025: 16.8%Mar 2026: 15.8%FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26

Technicals

Trend interpretation, Stage 2, relative strength, volume and indicator evidence

Daily technical trend read

Bearish setup

Trend is weak — long-term trend down. RSI 35.

  • Price < SMA20 < SMA50 < SMA200 — full bearish stack.
  • SMA20 falling (~4.1% over last month) — short-term momentum negative.
  • RSI(14) at 35 — falling, no extreme reading.
  • MACD below signal but histogram contracting — bearish momentum easing.
  • Within 5% of 52-week low — testing support.

Mechanical read from the price + indicator series above. Not a recommendation — technical setups can reverse without warning, especially around earnings and macro events.

Nifty 500 leadership

Relative Strength & Trend Stage

30
RS percentile
Stage 4 Downtrend
1M return
-7.4%
3M return
-13.3%
6M return
-21.7%
1Y return
-13.1%
RS 1D
+1
RS 20D
-3
Sector rank
#17
Industry rank
-
Stage evidence
  • Price is 12.0% below the 30-week proxy.
  • The 50-DMA is below the 30-week proxy and its slope is falling -2.0%.
  • Both 3-month and 6-month returns are negative.
50-DMA
price below
200-DMA
price below
Sector
lagging
Industry
unranked
Relative-strength line vs Nifty 500 (base 100)
261 observations
19 Oct 2026Value 92.04+0.99%
8795104112120Sept 25Feb 26Jun 26Oct 2692
RS vs Nifty 50092

Valuation & peers

U-Score 38 · legacy U-Score band WATCHLIST · valuation evidence and comparable companies

38U-SCORE
WATCHLIST

Fundamental score breakdown

U band · WATCHLIST
Valuation6/30
Growth5/25
Quality8/20
Balance Sheet7/15
Cash Flow6/10
Piotroski
7/9 (+5)
Penalties
1
Raw sum
38

Why this score?

Top U-Score contributors and drags from the latest stored fundamentals.

38/100 · legacy band WATCHLIST

Positive drivers

  • Piotroski is strong at 7/9.
  • Cash flow contributes 6/10 to the score.
  • Balance sheet contributes 7/15 to the score.

Main drags

  • Fair-value margin of safety is negative at -47.7%.
  • Valuation is weaker at 6/30; verify the latest quarterly trend.
  • Growth is weaker at 5/25; verify the latest quarterly trend.
Sector valuation model

Execution business valuation: EV/EBITDA plus order and working-capital risk

Capital-intensive execution stories need cash-flow and balance-sheet checks alongside valuation.

Execution EV/EBITDA
Primary lens
EV/EBITDA and PE against execution quality and margin stability.
Secondary checks
Order book, receivables, working capital, debt, operating cash flow.
Main risk check
Order wins matter only if they convert into cash and margins.
PE
14.6
PB
2.3
EV/EBITDA
8.0
ROE
15.3%
ROCE
9.1%
FCF Yield
2.4%
Debt/Equity
1.5
MoS
-47.7%
Score movement

Stored run vs live recompute

This shows the stored score trend when snapshots exist, and also compares the latest stored nightly score with a live recompute from current fundamentals and price.

Stored run: 21 Oct 2026
v4.3-runtime-valuation
Final score
38
Previous: 38
Legacy U-Score band
WATCHLIST
Previous: WATCHLIST
Margin of safety
-47.7%
Previous: -49.6%

Score history

12 stored score snapshots. Latest stored move: +0 points.

21 Oct 2026
v4.3-runtime-valuation
38
38
38
38
38
38
38
38
38
38
38
38

Factor attribution

No pillar movement versus the latest stored run. Historical score trend will appear after snapshot storage is enabled.

Modelled fair value

Graham Number
₹203.79
-21.2% MoS
Growth-justified P/E
9.8
Growth-justified Value
₹167.31
-47.7% MoS
PEG
4.87

Comparable companies

Peers

Business-comparable peers in Power — ranked by industry, sub-sector, theme-tag overlap, market cap, and U-Score similarity. Green cells mark the best available peer metric in this table.

Compare all ↗
Ticker
Name
Why peer
Score
PE
ROE
MoS
Verdict
ADANIENSOL
Large
Adani Energy Solutions Limited
Power Transmission
match 156
24
57.1
9.4%
-86%
OVERVALUED
PIXTRANS
Small
Pix Transmissions Limited
Power Transmission
match 114
58
19.0
16.4%
+39%
FAIR VALUE
DPSCLTD
Small
DPSC Limited
Power Transmission
match 114
18
51.1
1.4%
-1237%
OVERVALUED
OMPOWER
Small
Om Power Transmission Limited
Power Transmission
match 113
77
12.3
38.2%
+59%
DEEP VALUE
GVT&D
Mid
GE Vernova T&D India Limited
Electrical Equipment
match 90
64
74.9
57.4%
-96%
UNDERVALUED

Business, management & trust

Growth engines, risks, management commitments and evidence-backed delivery

Business and thesis

Where growth can come from, and what can break the case

Thesis under stressReviewed 2026-10-12T09:13:06.471Z
Management commentary snapshot

Q1 FY27 PAT declined 1% YoY to Rs. 3,598 crore despite a 3% increase in transmission charges, impacted by regulatory tariff characteristics and lower interest on differential tariffs.

PAT growth is under pressure due to the inherent regulatory tariff regime, which reduces revenue from older assets after 12 years, and lower interest income from CERC order differentials. While underlying transmission charges and the asset base continue to grow, the regulatory drag masks operational performance.

Current business mix

Works in Hand by Project Type (as of July 2026)

Latest issuer-disclosed distribution across 3 reported categories.

Businessmix
TBCB83.4%
RTM14.3%
Other business (smart metering, data center, BESS)2.4%
Growth engines

Renewable Energy Integration

Projects associated with RE generation in states like Karnataka and Rajasthan are being commissioned.

New Asset Classes

Maiden foray into Synchronous Condensers to improve grid strength and RE integration, with two such units in Fatehgarh II.

New Load Centers

Data centers, green hydrogen, and green ammonia are emerging as strong intake for transmission systems, with 71 GW potential.

Cross-border Grid Integration

The 'One Sun, One World, One Grid' initiative is gaining active traction for strengthening the grid beyond borders.

Capacity and execution

Transmission Lines Commissioned (Q1 FY27)

1,635 circuit kilometers, representing 35% of last year's Q1 achievement.

Transformation Capacity Added (Q1 FY27)

10,500 MVA added.

Major Systems Completed Post-June '26

765 kV Raichur-Koppal II PS line, 400 kV Gadag II-Koppal II PS, and 400 kV Bikaner II and Bikaner III lines.

New Substation Completion

A new 765/400 kV substation in Koppal has been completed.

Tailwinds

Government Support for RE

National Electricity Plan targets 900+ GW non-fossil capacity by 2035-36, driving transmission investment.

Improved Project Timelines

Government has revisited and improved transmission project timelines to 26-30+ months, making them more practical.

Easing Equipment Supply

OEMs are ramping up capacities, reducing stress on equipment availability and potentially improving pricing and timelines.

New Mobile GIS Bays

Successful indigenous development of 220 kV and 132 kV mobile GIS bays, with 400 kV GIS bay coming soon, aiding urgent situations.

Headwinds

Regulatory Drag on PAT

Revenue reduction of Rs. 560 crore in Q1 FY27 due to depreciation and interest trajectory in the regulated regime.

Lower Interest on Differential Tariff

Reduced revenue of Rs. 230 crore in Q1 FY27 from interest accrued due to CERC order delays compared to Q1 FY26.

Land Compensation Uncertainty

New land compensation guidelines for Right of Way (ROW) are not yet fully factored into project estimates, with states still adopting mechanisms.

Risk radar

Execution Delays

Challenges persist due to Right of Way (ROW) issues, increased urbanization, and other infrastructure development.

Cost Escalation

General estimates for long-term capex (e.g., Rs. 7.9 lakh crore) may not fully factor in inflation or potential increases from new land compensation guidelines.

Equipment Raw Material Costs

Raw material prices for transformers and other equipment remain a factor influencing project costing, despite increased supply capacity.

Management accountability

What management said, and what results must prove

Issuer guidance and extracted claims are tracked against later reported outcomes. Treat these as management statements, not IndiaPulse forecasts.

Analyst reading lens
Compare YOY

The transcript explicitly compares Q1 FY27 financial performance and operational metrics (capex, capitalization) with Q1 FY26, indicating a year-on-year focus for performance evaluation.

Sector KPIs management disclosed

Gross Fixed Assets

Rs. 3.25 lakh crore plus (as on 30th June 2026)

Transmission Lines (ckt km)

1,86,000 circuit kilometers (as on 30th June 2026)

Transformation Capacity (MVA)

6,34,516 MVA (as on 30th June 2026)

System Availability

99.8%

Management forward view

Growth & Profitability Balance

Management aims to ensure both growth and profitability in its TBCB endeavors, with returns calibrated for investor comfort.

BESS Opportunity

Actively pursuing integrated storage (BESS) projects under the regulatory portion (Section 62 of Electricity Act), with petitions filed.

Improved Disclosures

Will examine providing better disclosures on TBCB performance to help analysts and investors better appreciate company financials.

Adherence to Government Guidelines

POWERGRID will adhere to government guidelines regarding procurement of equipment from neighboring countries, including Chinese OEMs.

Thesis monitor

Numbers and claims to verify in the next filings

CheckpointCurrent evidenceWhat to verify next
BESS Project AwardsPetitions filed with regulator after Northern and Western Region RPC clearances.Regulator's position and actual project awards under the integrated storage business.
Rajasthan Barmer Complex HVDC ProjectInitial offers submitted and being evaluated by the bid process coordinator.Announcement of next steps and eRA date by the bid process coordinator.
Land Compensation MechanismNew guidelines adopted by some states, but mechanism for MRC (Market Rate Compensation) still settling.Clarity on compensation quantum and its impact on project costs and timelines.
TBCB Performance TransparencyLimited consolidated P&L disclosure for TBCB projects.Improved disclosures on TBCB revenue, EBITDA, and PAT to aid investor analysis.

Verification checkpoints are IndiaPulse research interpretation, not investment advice.

Trust Score
64Limited evidence · low confidenceTrust Lite

Trust asks: does management behaviour match later outcomes? Higher is better, but confidence and evidence depth matter as much as the number.

Limited evidence: Claim history is still being built. It ranks around the 42nd percentile of the scored universe and 47th percentile within Power. Main check: financial discipline is weak at 50/100.

This is a financial-behaviour screen, not a claim-tested management reliability verdict.

Computed 21 Oct 2026
management-trust-v1
104 docs text-extracted · 35 concalls text-extracted
Score band
Limited evidence

Financial behaviour is scored, but management claims do not yet have enough outcome checks.

Relative rank
42nd percentile

overall median 67 · Power: 47th pctile, median 65 · Large: 20th pctile, median 73

Evidence depth
Financial-only

104 documents have extracted text, but claim history is not strong enough yet.

Claim delivery
Outcome history still building

0 claims extracted · No contradicted claim yet

How to read this Trust Score

Limited evidence · low confidence
What it measures
Reliability of management and financial delivery, using financial behaviour only.
Confidence
Treat this as an early read until more concalls and outcomes are matched.
Investor use
Acceptable, but check the weakest sub-score before increasing exposure.

Read Trust alongside U-Score, result consistency, and technical trend. A cheap stock with weak Trust needs a larger margin of safety; a high Trust score does not make an expensive stock attractive by itself.

Forensic breakdown

Read low sub-scores as due-diligence warnings, not automatic sell signals.

Promoter
78
strong · holding, pledge, alignment
Cash flow
77
strong · profit to cash conversion
Balance sheet
53
watch · leverage and solvency
Discipline
50
watch · capital discipline
Results
57
watch · quarterly consistency

Trust positives

  • ▸Promoter pledge is zero.
  • ▸FCF yield is positive at 2.4%.
  • ▸8 years of positive FCF.
  • ▸3/4 latest quarters had positive YoY revenue growth.

Trust risks

  • ▸Debt/equity is 1.47.
  • ▸ROCE trend is -2.6%.
  • ▸OPM spread across recent quarters is 41%.

Trust Lite uses financial behaviour only. Prefer claim-tested Trust when enough concall claims have later outcomes.

Important announcements & filings

Latest exchange and company disclosures found within the past two years.

12 shown
Announcement

Announcement under Regulation 30 (LODR)-Acquisition 12 Oct - POWERGRID acquired Lakadia C Power Transmission Limited for about Rs. 19.94 crore on 12.10.2026.

Source: Bse

Open source ↗
Announcement

Announcement under Regulation 30 (LODR)-Acquisition 12 Oct - POWERGRID acquired Jam Khambhaliya REZ Transmission Limited for Rs 19.22 crore on 12.10.2026.

Source: Bse

Open source ↗
AnnouncementSep 2026

Sep 2026 · Announcement under Regulation 30 (LODR)-Change in Management 30 Sep - Executive Directors Atul Kumar Bali and Dilip Nagesh Rozekar ceased on 30 September 2026 upon superannuation.

Source: Bse

Open source ↗
AnnouncementSep 2026

Sep 2026 · Announcement under Regulation 30 (LODR)-Change in Directorate 30 Sep - Shri Akhilesh Pathak appointed Director (Projects) effective 30 September 2026 until 31 May 2028.

Source: Bse

Open source ↗
AnnouncementSep 2026

Sep 2026 · Announcement under Regulation 30 (LODR)-Acquisition 23 Sep - POWERGRID acquired Barmer HVDC Power Transmission Ltd on 23 Sep 2026 for Rs 18.98 crore.

Source: Bse

Open source ↗
Announcement

Announcement under Regulation 30 (LODR)-Newspaper Publication 25 Sep - Newspaper publication regarding Special Window for Transfer and Dematerialization of Physical Securities.

Source: Bse

Open source ↗
Announcement

Announcement under Regulation 30 (LODR)-Appointment of Statutory Auditor/s 8 Sep - C&AG appoints four joint statutory auditors for FY 2026-27.

Source: Bse

Open source ↗
Investor presentationAug 2026

Aug 2026 · PPT

Source: Bse

Open source ↗
Concall transcriptAug 2026

Aug 2026 · Transcript

Source: Bse

Open source ↗
AnnouncementAug 2026

Aug 2026 · Announcement under Regulation 30 (LODR)-Change in Management 31 Aug - Shri Vibhay Kumar ceases as Executive Director on 31 August 2026 upon superannuation.

Source: Bse

Open source ↗
Announcement

Announcement under Regulation 30 (LODR)-Acquisition 28 Aug - POWERGRID acquired Fatehgarh II Transmission Limited on 28.08.2026 for about Rs. 19.11 crore.

Source: Bse

Open source ↗
Announcement

Announcement under Regulation 30 (LODR)-Newspaper Publication 7 Aug - Newspaper publication of unaudited financial results of the Company for the quarter ended 30.06.2026

Source: Bse

Open source ↗
Verify on:NSE India ↗
All information is for study purposes only. For investment decisions, consult your financial advisor. See Playbook for methodology.