NTPC Limited is a leading Indian power generation company with a diversified portfolio including thermal, hydro, and renewable energy. It is expanding into nuclear power and pumped storage projects, focusing on capacity additions and sustainable value creation across its standalone and group entities.
full bear SMA stack · SMA20 -4.0% / mo · MACD − · near 52W low
Latest mapped FPI equity flow was not positive. View sector evidence
Adjusted completed-session prices, rebased to 100
Investable fundamentals, management evidence is still limited to a financial-only Trust Lite signal, price trend argues for patience, and recent execution is consistent.
Fundamental lens: valuation, quality, growth, balance sheet, and cash flow.
Revenue +7.8% · PAT +12.9% YoY
Price trend and sector-relative-strength timing.
Legacy margin-of-safety estimate; the revised evidence label remains in shadow validation.
Financial-only signal; management claim evidence is not sufficient yet.
Fundamentals, quarterly history, margins, returns and balance-sheet evidence
Rev +8% YoY · PAT +13% YoY · margin expansion · operating leverage
| Metric | This quarter | YoY | QoQ |
|---|---|---|---|
| Revenue | ₹50,741 Cr | +7.8% | +2.1% |
| EBITDA | ₹16,231 Cr | +29.0% | +90.8% |
| Operating margin | 32.0% | +500 bps | +1500 bps |
| PAT | ₹6,896 Cr | +12.9% | -35.0% |
| PAT margin | 13.6% | +61 bps | -777 bps |
NDF means not disclosed in the current structured filing feed. It is intentionally not treated as zero.
Updated 20/10/2026
Trend interpretation, Stage 2, relative strength, volume and indicator evidence
Signals are conflicting — long-term trend down. RSI 35. Wait for confirmation.
Mechanical read from the price + indicator series above. Not a recommendation — technical setups can reverse without warning, especially around earnings and macro events.
U-Score 67 · legacy U-Score band UNDERVALUED · valuation evidence and comparable companies
Top U-Score contributors and drags from the latest stored fundamentals.
Capital-intensive execution stories need cash-flow and balance-sheet checks alongside valuation.
This shows the stored score trend when snapshots exist, and also compares the latest stored nightly score with a live recompute from current fundamentals and price.
12 stored score snapshots. Latest stored move: +0 points.
Business-comparable peers in Power — ranked by industry, sub-sector, theme-tag overlap, market cap, and U-Score similarity. Green cells mark the best available peer metric in this table.
Growth engines, risks, management commitments and evidence-backed delivery
NTPC Group reports highest ever capacity addition of 9,178 MW (net) in FY26. Standalone PAT for FY26 grew to ₹23,162 Cr, up from ₹19,649 Cr in FY25, despite a decline in coal PLF and commercial generation.
The investment thesis remains intact due to significant capacity expansion and robust PAT growth in FY26. However, a decline in standalone coal PLF and commercial generation, alongside lower average tariff, warrants close monitoring of operational efficiency and realization trends.
Added 5,488 MW RE capacity in FY26. 15,037 MW RE capacity is currently under construction across the group.
JV with NPCIL for 2800 MW Mahi Banswara Atomic Power Project. Established wholly owned subsidiary NPUNL for advanced nuclear technologies.
Strategically positioned with an 18 GW pumped storage portfolio. 750 MW commissioned in FY26, another 250 MW in April 2026.
5 GWh BESS capacity allocated under VGF scheme, with projects awarded across 14 thermal power stations.
9,178 MW (net after decommissioning Tanda Stage 1).
3,690 MW (net) including Barh (660 MW), North Karanpura (660 MW), THDC Khurja (660 MW), PVUNL (800 MW), Sinnar (1350 MW).
5,488 MW, including Nokh Solar (490 MW), THDC-PSP (750 MW), NREL Solar (3240 MW), NREL Wind (146 MW), Ayana Solar (688 MW), Ayana Wind (152 MW).
34,188 MW, comprising 16,520 MW Coal, 2,631 MW Hydro (incl PSP), and 15,037 MW Renewables.
5 GWh BESS capacity allocated under the Viability Gap Funding (VGF) scheme to optimize thermal generation and ensure reliable power supply.
CERC tariff orders positively impacted NTPC Tamil Nadu Energy Company Ltd. and Aravali Power Company Private Ltd. in FY26.
Group thermal stations co-fired 15.19 lakh metric tonnes of biomass in FY26, more than double the previous year.
Standalone commercial generation decreased YoY in FY26 from 372.800 BU to 352.529 BU.
Standalone coal PLF declined YoY in FY26 from 77.44% to 72.04%.
Standalone average tariff decreased YoY in FY26 from ₹2.82/kWh to ₹2.74/kWh.
Ratnagiri Gas & Power Private Ltd. profit declined due to one-time revenue recognition in prior year. Bangladesh-India Friendship Power Co. Pvt. Ltd. profit declined due to tariff adjustment and worker fund provisions.
Declining standalone coal PLF and commercial generation could impact profitability if not reversed, despite new capacity additions.
A decrease in standalone average tariff could pressure revenue growth and overall financial performance.
The large pipeline of 34,188 MW capacity under construction carries inherent risks related to timely execution, commissioning, and cost overruns.
Issuer guidance and extracted claims are tracked against later reported outcomes. Treat these as management statements, not IndiaPulse forecasts.
Annual comparisons (YoY) are crucial for assessing overall financial health and full-year operational trends in power generation. Sequential (QoQ) data offers insight into recent operational momentum and seasonal variations, particularly for PLF and generation volumes.
FY26: 89,108 MW vs FY25: 79,930 MW
9,178 MW added in FY26, highest ever capacity addition.
FY26: 352.529 BU vs FY25: 372.800 BU (YoY decline). Q4 FY26: 91.050 BU vs Q3 FY26: 87.251 BU (QoQ increase).
FY26: 72.04% vs FY25: 77.44% (YoY decline). Q4 FY26: 76.16% vs Q3 FY26: 71.03% (QoQ increase).
Committed to delivering sustainable value to shareholders by balancing payouts with deployment for growth plans.
Expanding into new frontiers like nuclear, pumped storage, and BESS to diversify energy sources and ensure future growth.
BESS deployment is planned across thermal power stations to optimize utilization of existing infrastructure and ensure reliable power supply during non-solar hours.
| Checkpoint | Current evidence | What to verify next |
|---|---|---|
| Standalone Coal PLF | 72.04% (FY26) | Reversal of the declining trend and improvement towards previous levels, indicating better operational efficiency. |
| Standalone Commercial Generation | 352.529 BU (FY26) | Growth in generation volume, particularly from newly commissioned capacities, to offset recent declines. |
| Standalone Average Tariff | ₹2.74/kWh (FY26) | Stabilization or improvement in realization rates to support revenue growth. |
| Capacity Under Construction | 34,188 MW (Group) | Timely commissioning and ramp-up of new thermal, hydro, and renewable projects as per stated timelines. |
Verification checkpoints are IndiaPulse research interpretation, not investment advice.
NTPC aims to invest a cumulative group capital expenditure of approximately INR 7 lakh crore by FY32.
"aim to invest about INR7 lakh crore by FY32"
NTPC aims to invest a cumulative group capital expenditure of approximately INR 7 lakh crore by FY32.
"aim to invest about INR7 lakh crore by FY32"
NTPC targets meeting at least 25% of its total coal requirement through captive mining by FY30.
"targets meeting at least 25% of its coal requirement through captive mining by FY30"
Outcome check: OPM moved from 29.0% to average 32.0% (+3.0 pp).
NTPC has revised its long-term capacity target upward to 149 gigawatts by FY32 from the earlier target of 130 gigawatts.
"upward revision is, it is 149 gigawatt by FY32 instead of 130"
NTPC has revised its long-term capacity target upward to 149 gigawatts by FY32 from the earlier target of 130 gigawatts.
"upward revision is, it is 149 gigawatt by FY32 instead of 130"
NTPC is likely to add around 6 gigawatts of renewable energy capacity during the current fiscal year.
"This year we are likely to add around 6 gigawatt"
NTPC is likely to add around 6 gigawatts of renewable energy capacity during the current fiscal year.
"This year we are likely to add around 6 gigawatt"
NTPC plans to award 2.8 gigawatts of nuclear power capacity within the current fiscal year.
"2.8 gigawatt of capacity planned to be awarded within this fiscal year"
Trust asks: does management behaviour match later outcomes? Higher is better, but confidence and evidence depth matter as much as the number.
Limited evidence: Management has 100% delivered/partly-delivered outcomes on 1 checked claims. It ranks around the 45th percentile of the scored universe and 52nd percentile within Power. Main check: balance sheet trust is weak at 35/100.
This is a financial-behaviour screen, not a claim-tested management reliability verdict.
Financial behaviour is scored, but management claims do not yet have enough outcome checks.
overall median 67 · Power: 52nd pctile, median 65 · Large: 23rd pctile, median 73
63 documents have extracted text, but claim history is not strong enough yet.
1/6 claims checked · No contradicted claim yet
Read Trust alongside U-Score, result consistency, and technical trend. A cheap stock with weak Trust needs a larger margin of safety; a high Trust score does not make an expensive stock attractive by itself.
Read low sub-scores as due-diligence warnings, not automatic sell signals.
Trust Lite uses financial behaviour only. Prefer claim-tested Trust when enough concall claims have later outcomes.
Latest exchange and company disclosures found within the past two years.
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse