Announcement Under Regulation 30 (LODR) - Letter Of Award 14 Oct - Adani Power received LoA from UPCL for 1,234 MW thermal supply under a 25-year PSA.
Source: Bse
Power stocks · Large cap · NSE
Adani Power Limited (APL) is India's largest private base load power company, operating an 18.33 GW thermal IPP portfolio across 9 states. It focuses on organic and inorganic growth, aiming for 42.05 GW capacity, leveraging operational excellence and a strong project execution engine.
SMA20 -5.3% / mo · MACD −
Latest mapped FPI equity flow was not positive. View sector evidence
Adjusted completed-session prices, rebased to 100
Mixed fundamentals, management evidence is still limited to a financial-only Trust Lite signal, price trend argues for patience, and recent execution is mixed.
Fundamental lens: valuation, quality, growth, balance sheet, and cash flow.
Revenue +34.0% · PAT +47.3% YoY
Price trend and sector-relative-strength timing.
Legacy margin-of-safety estimate; the revised evidence label remains in shadow validation.
Financial-only signal; management claim evidence is not sufficient yet.
Fundamentals, quarterly history, margins, returns and balance-sheet evidence
Rev +34% YoY · PAT +47% YoY · margin expansion · +33% QoQ · operating leverage
| Metric | This quarter | YoY | QoQ |
|---|---|---|---|
| Revenue | ₹18,902 Cr | +34.0% | +32.9% |
| EBITDA | ₹7,949 Cr | +39.8% | +68.0% |
| Operating margin | 42.0% | +200 bps | +900 bps |
| PAT | ₹4,867 Cr | +47.3% | +13.9% |
| PAT margin | 25.8% | +233 bps | -428 bps |
NDF means not disclosed in the current structured filing feed. It is intentionally not treated as zero.
Updated 21/10/2026
Trend interpretation, Stage 2, relative strength, volume and indicator evidence
Signals are conflicting — long-term trend down. RSI 39. Wait for confirmation.
Mechanical read from the price + indicator series above. Not a recommendation — technical setups can reverse without warning, especially around earnings and macro events.
U-Score 45 · legacy U-Score band WATCHLIST · valuation evidence and comparable companies
Top U-Score contributors and drags from the latest stored fundamentals.
Capital-intensive execution stories need cash-flow and balance-sheet checks alongside valuation.
This shows the stored score trend when snapshots exist, and also compares the latest stored nightly score with a live recompute from current fundamentals and price.
12 stored score snapshots. Latest stored move: +0 points.
Business-comparable peers in Power — ranked by industry, sub-sector, theme-tag overlap, market cap, and U-Score similarity. Green cells mark the best available peer metric in this table.
Growth engines, risks, management commitments and evidence-backed delivery
Q1 FY27 revenue grew 20% YoY to $2,040 Mn, with PAT up 33% YoY to $514 Mn. FY26 saw a 5% YoY decline in revenue to $6,553 Mn and PAT to $1,469 Mn.
APL demonstrates strong Q1 FY27 performance with robust PAT growth, supported by significant locked-in capacity and a clear expansion pipeline. The company's strong capital structure and self-funding capability for future capex reinforce its long-term growth thesis, despite a slight dip in FY26.
Latest issuer-disclosed distribution across 2 reported categories.
Target capacity of 42,050 MW, with 23,720 MW locked-in capacity across 13 projects by FY32.
Proven capabilities in acquiring, integrating, and turning around 7.45 GW of stressed assets.
95% of existing capacity tied up in long-term PPAs, with 13.32 GW new PPAs for upcoming projects.
Only IPP in India with in-house, mine-to-plant logistics capability and entry into commercial mining with 14 MTPA capacity.
18,330 MW as of Q1 FY27.
23,720 MW across 13 projects by FY32, with 100% land availability and 100% BTG sets ordered.
42,050 MW, including ongoing organic thermal expansion.
Includes Korba Ph-II (1,320 MW), Mahan Ph-II (1,600 MW), Raipur Ph-II (1,600 MW), Raigarh Ph-II (1,600 MW), Mirzapur (1,600 MW), Pirpainti (2,400 MW), Anuppur (2,400 MW), Chapar (3,200 MW), Kawai Ph-III (1,600 MW), Raigarh Ph-III (1,600 MW).
India's real GDP grew 7.8% in FY26 and targets ~$35 Tn GDP by 2047, driving significant power demand.
India's electricity consumption per capita is ~1/3rd of the global average, with installed capacity targeted to reach ~1,000 GW by FY32.
Strong policy thrust for additional thermal capacity (97 GW required by FY35) and coal allocation under the SHAKTI policy.
Driving demand for green hydrogen, primary industry, and indigenization, contributing to overall industrial growth.
Reliance on imported fuel for some plants (e.g., Mundra, Udupi) could expose capacity to global price fluctuations, despite pass-through mechanisms.
The highly regulated power sector faces risks from changes in tariff structures, environmental norms, or coal allocation policies.
Large-scale capacity additions (23.7 GW locked-in, 42 GW target) inherently carry execution risks, despite brownfield focus and PMAG.
Issuer guidance and extracted claims are tracked against later reported outcomes. Treat these as management statements, not IndiaPulse forecasts.
The presentation explicitly provides YoY comparisons for both Q1 FY27 and FY26 financial results, indicating this is the preferred basis for evaluating performance trends and growth.
18,330 MW (Q1 FY27)
96% (Q1 FY27)
78% (Q1 FY27)
₹5.93/kWh (Q1 FY27)
Management states the majority of expansion capex will be funded through internal accruals, with $16 Bn FFO from the existing fleet over 7 years.
Focus on maintaining 90%+ plant availability and leveraging AI/ML for O&M to ensure high dispatch and profitability.
Integrated vendor ecosystem and strategic partnerships are in place to mitigate execution and supply chain risks.
Targeting a reduction in GHG emission intensity to 0.84 tCO2e/MWh by FY27 and maintaining zero health & safety related injuries.
| Checkpoint | Current evidence | What to verify next |
|---|---|---|
| Net Debt to Continuing EBITDA | 2.12x (Jun’26 TTM) | Sustained low leverage amidst aggressive capex and expansion plans. |
| Plant Availability / PLF | 96% / 78% (Q1 FY27) | Consistent high operational performance across the expanding fleet. |
| Capacity Commissioning | 18,330 MW operating | Timely commissioning and ramp-up of the 23.7 GW locked-in capacity. |
| New PPA Tie-ups | 13.32 GW for upcoming projects | Securing PPAs for remaining untied capacity and new bids to ensure revenue visibility. |
Verification checkpoints are IndiaPulse research interpretation, not investment advice.
Trust asks: does management behaviour match later outcomes? Higher is better, but confidence and evidence depth matter as much as the number.
Limited evidence: Claim history is still being built. It ranks around the 63rd percentile of the scored universe and 73rd percentile within Power. Main check: results consistency is weak at 55/100.
This is a financial-behaviour screen, not a claim-tested management reliability verdict.
Financial behaviour is scored, but management claims do not yet have enough outcome checks.
overall median 67 · Power: 73rd pctile, median 65 · Large: 40th pctile, median 73
119 documents have extracted text, but claim history is not strong enough yet.
0 claims extracted · No contradicted claim yet
Read Trust alongside U-Score, result consistency, and technical trend. A cheap stock with weak Trust needs a larger margin of safety; a high Trust score does not make an expensive stock attractive by itself.
Read low sub-scores as due-diligence warnings, not automatic sell signals.
Trust Lite uses financial behaviour only. Prefer claim-tested Trust when enough concall claims have later outcomes.
Latest exchange and company disclosures found within the past two years.
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse