Announcement under Regulation 30 (LODR)-Newspaper Publication 4 Sep - Notice of 31st Annual General Meeting published in Financial Express and Nava Telangana
Source: Bse
Infra stocks · Micro cap · NSE
KNR Constructions Limited is an Indian infrastructure development company with a diversified order book across roads, railways, urban mobility, irrigation, pipelines, and mining. The company focuses on project execution and strategic diversification into new growth areas while maintaining discipline in project selection.
full bear SMA stack · SMA20 -5.6% / mo · MACD − · near 52W low · sector -2.7pp vs Nifty 500 (3M)
FPI equity flow was positive in both fortnights, but the sector index is below its 100-session average. View sector evidence
Adjusted completed-session prices, rebased to 100
Weak fundamentals, management evidence is still limited to a financial-only Trust Lite signal, price trend argues for patience, and recent execution is weak.
Fundamental lens: valuation, quality, growth, balance sheet, and cash flow.
Revenue -4.1% · PAT -34.1% YoY
Price trend and sector-relative-strength timing.
Legacy margin-of-safety estimate; the revised evidence label remains in shadow validation.
Financial-only signal; management claim evidence is not sufficient yet.
Fundamentals, quarterly history, margins, returns and balance-sheet evidence
Rev -4% YoY · PAT -34% YoY · margin compression
| Metric | This quarter | YoY | QoQ |
|---|---|---|---|
| Revenue | ₹588 Cr | -4.1% | -15.5% |
| EBITDA | ₹96 Cr | -47.5% | -43.2% |
| Operating margin | 16.0% | -1400 bps | -800 bps |
| PAT | ₹81 Cr | -34.1% | -23.6% |
| PAT margin | 13.8% | -629 bps | -145 bps |
NDF means not disclosed in the current structured filing feed. It is intentionally not treated as zero.
Updated 20/10/2026
Trend interpretation, Stage 2, relative strength, volume and indicator evidence
Trend is weak — long-term trend down. RSI 38.
Mechanical read from the price + indicator series above. Not a recommendation — technical setups can reverse without warning, especially around earnings and macro events.
U-Score 44 · legacy U-Score band WATCHLIST · valuation evidence and comparable companies
Top U-Score contributors and drags from the latest stored fundamentals.
Capital-intensive execution stories need cash-flow and balance-sheet checks alongside valuation.
This shows the stored score trend when snapshots exist, and also compares the latest stored nightly score with a live recompute from current fundamentals and price.
12 stored score snapshots. Latest stored move: +0 points.
Business-comparable peers in Infra — ranked by industry, sub-sector, theme-tag overlap, market cap, and U-Score similarity. Green cells mark the best available peer metric in this table.
Growth engines, risks, management commitments and evidence-backed delivery
Q1 FY27 consolidated revenue at INR587.9 cr, with reported EBITDA margin of 16.4%. However, excluding a one-off cash surplus of INR46 cr, the adjusted EBITDA margin was 5.5%, indicating underlying operational weakness.
Q1 FY27 results show significant margin pressure ex-one-off, and working capital days and net debt to equity have increased. While the order book is robust and management projects strong H2 FY27 and FY28 growth, execution ramp-up and recovery of large receivables are critical to validate the outlook and alleviate balance sheet stress.
Latest issuer-disclosed distribution across 4 reported categories.
Actively evaluating railway and metro projects, seeing healthy activity and strong government focus on capacity expansion.
Recently won a coal mining project worth INR3,361 crores, making mining 45% of the total order book.
Two new HAM projects (Chennai ECR and Telangana NHAI) are expected to start in Q3 FY27.
Project worth INR3,361 crores (excluding GST) to be executed over eight years, expected to start in September.
Chennai ECR and Telangana NHAI HAM projects are expected to receive Appointed Dates in Q3 FY27.
Planning INR350-400 crores capex for FY27, primarily for mining, with INR400-450 crores for Kusmunda this year.
Union budget allocated INR3.1 lakh crores to MoRTH for FY27, an 8% increase in road sector capex outlay.
Record INR2.93 lakh crores capital expenditure allocated to Indian Railways for FY27, creating a healthy project pipeline.
NHAI outlined a revised FY27 plan to award 54 highway and expressway projects covering 2,444 km worth INR1.8 lakh crores.
Road sector project awarding remained subdued in initial FY27, following softness witnessed through FY26.
Older Banhardih mining project requires 8-10 more months to start due to pending Stage 2 forest clearance.
Kusmunda mining project start is challenged by non-stop rains, delaying the appointed date and haul road preparation.
Working capital days increased to 133 from 78, and consolidated net debt to equity rose to 0.9 from 0.49 QoQ.
INR1,300 crores outstanding from Telangana Package 4, requiring continuous follow-up for installment payments.
Mysore to Kushalnagara HAM projects faced delays due to land acquisition and public obstruction issues, now resolved.
Initial bids for battery storage systems 'went very bad' due to unhealthy pricing and external factors like increasing dollar price.
Issuer guidance and extracted claims are tracked against later reported outcomes. Treat these as management statements, not IndiaPulse forecasts.
Q1 results for infrastructure companies are often seasonal, making year-on-year comparisons relevant. However, sequential momentum (QoQ) is crucial for tracking project execution ramp-up, especially with new HAM and mining projects expected to start in Q3 FY27.
Total order book stands at INR15,234 crores.
Current order book executable over 3 to 3.5 years, excluding mining projects. Mining projects are 5 to 8 years.
Revenue for the quarter stood at INR587.9 crores.
Reported EBITDA margin was 16.4%. Excluding a INR46 crores net one-off cash surplus, the adjusted EBITDA margin was approximately 5.5%.
Targeting FY27 revenue of INR2,200-2,300 crores (10-15% growth) with an EBITDA margin of 8-9%.
Expects FY28 to be a 'good year', targeting revenue of more than INR3,000 crores with an EBITDA margin of 11-12%.
Expecting INR400-500 crores from Telangana government in FY27 through 5-6 installments for irrigation dues.
Management is considering a buyback, with a final decision pending a board meeting.
| Checkpoint | Current evidence | What to verify next |
|---|---|---|
| Telangana Irrigation Receivables | INR1,300 crores outstanding from Package 4. | Timely receipt of INR400-500 crores in FY27 as per management's expectation. |
| Execution Ramp-up | Q1 FY27 revenue INR587.9 crores, with new HAM and mining projects starting Q3. | Achievement of targeted FY27 revenue of INR2,200-2,300 crores and FY28 revenue >INR3,000 crores. |
| EBITDA Margin | Q1 FY27 adjusted EBITDA margin 5.5%. | Improvement to 11-12% in H2 FY27 and sustained 11-12% in FY28 as new projects scale up. |
| Working Capital & Net Debt | Working capital days at 133, Net Debt/Equity at 0.9. | Stabilization or reduction in working capital days and net debt to equity as project execution improves and receivables are collected. |
Verification checkpoints are IndiaPulse research interpretation, not investment advice.
Trust asks: does management behaviour match later outcomes? Higher is better, but confidence and evidence depth matter as much as the number.
Limited evidence: Claim history is still being built. It ranks around the 13th percentile of the scored universe and 21st percentile within Infra. Main check: results consistency is weak at 5/100.
This is a financial-behaviour screen, not a claim-tested management reliability verdict.
Financial behaviour is scored, but management claims do not yet have enough outcome checks.
overall median 67 · Infra: 21st pctile, median 64 · Micro: 9th pctile, median 73
153 documents have extracted text, but claim history is not strong enough yet.
0 claims extracted · No contradicted claim yet
Read Trust alongside U-Score, result consistency, and technical trend. A cheap stock with weak Trust needs a larger margin of safety; a high Trust score does not make an expensive stock attractive by itself.
Read low sub-scores as due-diligence warnings, not automatic sell signals.
Trust Lite uses financial behaviour only. Prefer claim-tested Trust when enough concall claims have later outcomes.
Latest exchange and company disclosures found within the past two years.
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse