Announcement under Regulation 30 (LODR)-Change in Directorate 24 Sep - Shareholders approved Sanjay Kumar and Dinesh Agarwal appointments, Rajeewa R Arya’s retirement, and Sanjana Khaitan’s reappointment.
Source: Bse
Industrials stocks · Micro cap · NSE
Websol Energy System Limited is an Indian solar cell and module manufacturer. The company focuses on DCR projects like PM-Surya Ghar and PM-KUSUM, and is expanding its manufacturing capacity and upgrading technology to TOPCon.
full bear SMA stack · SMA20 -8.7% / mo · MACD +
Latest mapped FPI equity flow was not positive. View sector evidence
Adjusted completed-session prices, rebased to 100
Strong fundamentals, management evidence is still limited to a financial-only Trust Lite signal, but price trend argues for patience. Suitable for staggered entry or watchlist confirmation rather than aggressive buying.
Strong U-Score but weak trend: timing is not confirming the thesis.
Fundamental lens: valuation, quality, growth, balance sheet, and cash flow.
Revenue +70.3% · PAT +16.4% YoY
Price trend and sector-relative-strength timing.
Legacy margin-of-safety estimate; the revised evidence label remains in shadow validation.
Financial-only signal; management claim evidence is not sufficient yet.
Fundamentals, quarterly history, margins, returns and balance-sheet evidence
margin compression · Rev +70% YoY · PAT +16% YoY
| Metric | This quarter | YoY | QoQ |
|---|---|---|---|
| Revenue | ₹373 Cr | +70.3% | -7.0% |
| EBITDA | ₹126 Cr | +22.3% | -13.7% |
| Operating margin | 34.0% | -1300 bps | -200 bps |
| PAT | ₹78 Cr | +16.4% | -37.1% |
| PAT margin | 20.9% | -968 bps | -1001 bps |
NDF means not disclosed in the current structured filing feed. It is intentionally not treated as zero.
Updated 20/10/2026
Trend interpretation, Stage 2, relative strength, volume and indicator evidence
Signals are conflicting — long-term trend down. RSI 35. Wait for confirmation.
Mechanical read from the price + indicator series above. Not a recommendation — technical setups can reverse without warning, especially around earnings and macro events.
U-Score 79 · legacy U-Score band DEEP VALUE · valuation evidence and comparable companies
Top U-Score contributors and drags from the latest stored fundamentals.
Capital-intensive execution stories need cash-flow and balance-sheet checks alongside valuation.
This shows the stored score trend when snapshots exist, and also compares the latest stored nightly score with a live recompute from current fundamentals and price.
12 stored score snapshots. Latest stored move: +0 points.
Business-comparable peers in Industrials — ranked by industry, sub-sector, theme-tag overlap, market cap, and U-Score similarity. Green cells mark the best available peer metric in this table.
Growth engines, risks, management commitments and evidence-backed delivery
Q1 FY27 revenue up 70% YoY to INR373 crores, PAT up 16% to INR78 crores. Cell utilization reached 92%, module utilization 81%. EBITDA margin moderated to 34% due to higher module sales mix.
Websol delivered strong operational growth with high utilization and significant revenue/EBITDA increase. Debt repayment and TOPCon upgrade are strategic positives. However, margin compression due to product mix and the shift in 4 GW expansion location to West Bengal warrant close monitoring for execution and cost implications.
The capacity we have built is now being used more fully, and that is the most important operating development of the quarter.
Upgrade of one existing mono PERC cell line to TOPCon, adding 750 MW capacity, taking overall cell capacity to 1.3 GW (55% TOPCon) by March 2027.
Planned 4-gigawatt cell manufacturing expansion, with land shortlisted in West Bengal, aiming for execution without delays.
Supplying to mostly DCR projects (PM-Surya Ghar and PM-KUSUM), not seeing any reduction in demand.
Upgrade of one existing mono PERC cell line to TOPCon, adding 750 MW capacity, taking overall cell capacity to 1.3 GW. Expected completion by March 2027 with INR270 crores capex.
Planned 4-gigawatt cell manufacturing expansion. Land approval expected this month (August 2026), construction to start in September, equipment ordered by December, trials by April-May, ramp-up from July.
Expect an increase in demand for solar sector going forward, considering the impact of AI, BESS, and night-time solar requirements.
Recent direction of the state towards greater industrialization, including proposed new industrial policy, simpler access to industrial land.
Establishing expansion in home state provides significant synergies in infrastructure, skilled manpower, supply chain, and operational resources.
Prices have increased in the current quarter on the count of the implementation of the ALMM initially.
EBITDA margin for the quarter was 34% against 47% in Q1 last year. Principal reason is change in sales mix, with more lower-margin modules sold.
Realization also has decreased in the last quarter; the price was much softer last quarter.
Carrying a little extra inventory as compared to last quarter because there's some cyclicality in the industry.
Change in location for 4 GW expansion from Andhra Pradesh to West Bengal. While management expects no delays, it introduces uncertainty.
Puzzling to see that we don't have any institutional interest; trading at a much bigger discount to peers.
In a span of 4 months, Websol share price falls from INR130 to INR50, and then in 1 month, it rises from INR50 to INR120.
Issuer guidance and extracted claims are tracked against later reported outcomes. Treat these as management statements, not IndiaPulse forecasts.
YoY is relevant for assessing growth against the previous year's base, especially for a company ramping up capacity. QoQ is important to track sequential momentum, utilization, and the impact of changing sales mix and realizations.
INR373 crores for the quarter, 70% higher than the same quarter last year.
INR126 crores, higher by 21%.
INR78 crores, higher by 16%.
Increased from 126 megawatt in Q1 last year to 259 megawatt this quarter.
Repaid entire INR110 crores IREDA term loan from internal accruals without raising fresh capital or slowing growth investments.
Objective is to operate the entire manufacturing base efficiently, to grow absolute earnings and cash generation.
TOPCon upgrade is a bridge between current capacity and the technology platform for the next phase of scale, including 4 GW expansion.
Continuously doing investor interaction with investor con-calls, and participating in various investors meets.
| Checkpoint | Current evidence | What to verify next |
|---|---|---|
| TOPCon Upgrade Completion | Expected by March 2027. | Timely completion and ramp-up of 750 MW TOPCon capacity. |
| 4 GW Expansion Land Approval | Expected this month (August 2026). | Official announcement of land allocation and commencement of construction. |
| Promoter Pledge Reduction | From 80% to 16% of promoter holding post debt repayment. | Formal release of pledged shares and updated SAST disclosure. |
| Blended EBITDA Margin | 34% in Q1 FY27. | Stabilization or improvement of margins as TOPCon capacity comes online and product mix evolves. |
Verification checkpoints are IndiaPulse research interpretation, not investment advice.
Trust asks: does management behaviour match later outcomes? Higher is better, but confidence and evidence depth matter as much as the number.
Limited evidence: Claim history is still being built. It ranks around the 59th percentile of the scored universe and 56th percentile within Industrials. Main check: promoter alignment is weak at 39/100.
This is a financial-behaviour screen, not a claim-tested management reliability verdict.
Financial behaviour is scored, but management claims do not yet have enough outcome checks.
overall median 67 · Industrials: 56th pctile, median 68 · Micro: 38th pctile, median 73
15 documents have extracted text, but claim history is not strong enough yet.
0 claims extracted · No contradicted claim yet
Read Trust alongside U-Score, result consistency, and technical trend. A cheap stock with weak Trust needs a larger margin of safety; a high Trust score does not make an expensive stock attractive by itself.
Read low sub-scores as due-diligence warnings, not automatic sell signals.
Trust Lite uses financial behaviour only. Prefer claim-tested Trust when enough concall claims have later outcomes.
Latest exchange and company disclosures found within the past two years.
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse