Aug 2026 · PPT
Source: Nse
Infra stocks · SME cap · NSE
Vishnusurya Projects and Infra Ltd. (VISHNUINFR) is an Indian infrastructure development company incorporated in 1996, headquartered in Chennai. It focuses on EPC construction (Roads, Rail, Marine, Housing, Water), construction aggregates & M-Sand, and waste management. The company operates 3 owned quarries in Tamil Nadu.
full bear SMA stack · SMA20 -7.7% / mo · MACD − · sector -2.7pp vs Nifty 500 (3M)
FPI equity flow was positive in both fortnights, but the sector index is below its 100-session average. View sector evidence
Today's candle is provisional from the latest intraday quote; completed-candle scans remain unchanged.
Adjusted completed-session prices, rebased to 100
Strong fundamentals, management evidence is still limited to a financial-only Trust Lite signal, but price trend argues for patience. Suitable for staggered entry or watchlist confirmation rather than aggressive buying.
Strong U-Score but weak trend: timing is not confirming the thesis.
Fundamental lens: valuation, quality, growth, balance sheet, and cash flow.
Revenue +25.0% · PAT +116.1% YoY
Price trend and sector-relative-strength timing.
Legacy margin-of-safety estimate; the revised evidence label remains in shadow validation.
Financial-only signal; management claim evidence is not sufficient yet.
Fundamentals, quarterly history, margins, returns and balance-sheet evidence
Rev +25% YoY · PAT +116% YoY · operating leverage · margin compression
| Metric | This quarter | YoY | QoQ |
|---|---|---|---|
| Revenue | ₹61.9 Cr | +25.0% | -51.4% |
| EBITDA | ₹11.1 Cr | +4.3% | +104.6% |
| Operating margin | 17.9% | -355 bps | +1364 bps |
| PAT | ₹5.9 Cr | +116.1% | -26.1% |
| PAT margin | 9.6% | +403 bps | +328 bps |
NDF means not disclosed in the current structured filing feed. It is intentionally not treated as zero.
Updated 21/10/2026
Trend interpretation, Stage 2, relative strength, volume and indicator evidence
Signals are conflicting — long-term trend down. RSI 47. Wait for confirmation.
Mechanical read from the price + indicator series above. Not a recommendation — technical setups can reverse without warning, especially around earnings and macro events.
U-Score 75 · legacy U-Score band DEEP VALUE · valuation evidence and comparable companies
Top U-Score contributors and drags from the latest stored fundamentals.
Capital-intensive execution stories need cash-flow and balance-sheet checks alongside valuation.
This shows the stored score trend when snapshots exist, and also compares the latest stored nightly score with a live recompute from current fundamentals and price.
12 stored score snapshots. Latest stored move: +0 points.
Business-comparable peers in Infra — ranked by industry, sub-sector, theme-tag overlap, market cap, and U-Score similarity. Green cells mark the best available peer metric in this table.
Growth engines, risks, management commitments and evidence-backed delivery
VISHNUINFR reported a 25% YoY revenue growth to ₹62 crore in Q1 FY27, with PAT surging 103% YoY to ₹6 crore. However, EBITDA declined 8% YoY, and EBITDA margins compressed significantly to 15.8% from 21.4%.
While revenue and PAT grew strongly YoY, the significant EBITDA margin compression and reported deferment of project awards and fund allocations raise concerns. Management attributes this to timing and external factors, but execution momentum and margin recovery need close monitoring in subsequent quarters.
Latest issuer-disclosed distribution across 5 reported categories.
Company aims to win large TWAD, SIPCOT & municipal water tenders and leverage JWIL partnership for pipeline & desalination projects, targeting ₹300Cr+ water order book annually.
Plans to increase capacity at Vandavasi & Hosur units and expand M-Sand in line with demand surge, targeting ₹160Cr+ aggregates revenue for FY27.
Aims to grow waste management revenue from ₹5Cr to ₹30Cr+ and bid for bio-mining in 5+ states, including PSU industrial waste projects.
Deepening JWIL + IDE Technologies partnership and building ₹500Cr+ consortium bidding capability to explore international water tech collaborations.
Strategic roadmap includes increasing capacity at Vandavasi & Hosur units for construction aggregates and M-Sand.
Union Budget 2025-26 allocated ₹11.21 lakh crore for infrastructure, indicating strong government push.
54% of Indian districts face water stress; Jal Jeevan Mission extended till 2028 with ₹8.69 lakh crore outlay, and AMRUT 2.0 for urban water projects.
India construction market projected to reach US$1.10 trillion by 2031, with M-Sand market CAGR of ~6% (2024-32) driven by river sand ban.
Increasing government focus on urban waste management and bio-mining, with states like TN, Odisha, WB, Jharkhand actively tendering projects.
Certain project awards and fund allocations experienced a temporary deferment due to external factors, impacting order inflows and execution pace in Q1 FY27.
Q1 FY27 witnessed some supply-chain disruptions amid ongoing geopolitical developments, impacting procurement timelines.
Management noted temporary deferment of project awards and fund allocations, impacting execution pace, though they expect it to progress.
Disclaimer mentions risks like 'fluctuations in input costs' which could impact project profitability.
Disclaimer notes 'competition' as a risk, which could affect order inflows and pricing power in the infrastructure sector.
The balance sheet shows Trade Receivables of ₹54 Cr and Trade Payables of ₹27 Cr in FY26, indicating potential working capital needs with growth.
Issuer guidance and extracted claims are tracked against later reported outcomes. Treat these as management statements, not IndiaPulse forecasts.
The company explicitly presents Q1 FY27 results against Q1 FY26, and management commentary focuses on year-on-year growth. Infrastructure projects often have longer cycles, making annual comparisons more relevant than sequential for underlying business trends.
Consolidated revenue from operations grew 25% year-on-year to ₹62 crore in Q1 FY27.
Profit After Tax increased 103% year-on-year to ₹6 crore in Q1 FY27.
EBITDA Margin declined to 15.8% in Q1 FY27 from 21.4% in Q1 FY26.
PAT Margins improved to 8.9% in Q1 FY27 from 5.5% in Q1 FY26.
With a healthy pipeline and improving visibility, management remains confident of achieving full-year objectives for FY27.
Going forward, focus will remain on timely execution, strengthening the order pipeline, and leveraging opportunities across infrastructure segments.
Anticipates deferred opportunities to progressively translate into order inflows and execution over the coming quarters.
Expects increasing utilisation across operations to support performance in the coming quarters as project activity gains momentum.
| Checkpoint | Current evidence | What to verify next |
|---|---|---|
| Order Inflow Momentum | Q1 FY27 saw temporary deferment of project awards and fund allocations. | Translation of deferred opportunities into order inflows and execution in subsequent quarters. |
| EBITDA Margin Recovery | EBITDA margin compressed to 15.8% in Q1 FY27 from 21.4% in Q1 FY26. | Improvement in operational efficiency and margin resilience as project activity gains momentum. |
| Water Infrastructure Order Book | Water Infra Projects constitute 89.55% of the current order book. | Progress towards the target of ₹300Cr+ water order book annually. |
| Aggregates Revenue Growth | Targeting ₹160Cr+ aggregates revenue for FY27. | Capacity expansion at Vandavasi & Hosur units and M-Sand demand surge translating into revenue. |
Verification checkpoints are IndiaPulse research interpretation, not investment advice.
Trust asks: does management behaviour match later outcomes? Higher is better, but confidence and evidence depth matter as much as the number.
Limited evidence: Claim history is still being built. It ranks around the 75th percentile of the scored universe and 78th percentile within Infra. Main check: results consistency is weak at 53/100.
This is a financial-behaviour screen, not a claim-tested management reliability verdict.
Financial behaviour is scored, but management claims do not yet have enough outcome checks.
overall median 67 · Infra: 78th pctile, median 64 · SME: 93rd pctile, median 64
7 documents have extracted text, but claim history is not strong enough yet.
0 claims extracted · No contradicted claim yet
Read Trust alongside U-Score, result consistency, and technical trend. A cheap stock with weak Trust needs a larger margin of safety; a high Trust score does not make an expensive stock attractive by itself.
Read low sub-scores as due-diligence warnings, not automatic sell signals.
Trust Lite uses financial behaviour only. Prefer claim-tested Trust when enough concall claims have later outcomes.
Latest exchange and company disclosures found within the past two years.
Source: Nse
Source: Nse
Source: Nse
Source: Nse
Source: Nse
Source: Nse
Source: Nse
Source: Nse
Source: Nse
Source: Nse
Source: Nse