Announcement under Regulation 30 (LODR)-Analyst / Investor Meet - Intimation 10 Sep
Source: Bse
Metals stocks · Micro cap · NSE
MOIL Limited is India's largest Manganese Ore producer, operating 10 mines in Madhya Pradesh and Maharashtra with a current production capacity of 3 MTPA. The company generates 30.5 MW of renewable energy, covering over 43% of its energy consumption. Manganese ore is a key ingredient in steel making.
full bear SMA stack · SMA20 -5.3% / mo · MACD − · near 52W low
Latest mapped FPI equity flow was not positive. View sector evidence
Adjusted completed-session prices, rebased to 100
Weak fundamentals, management evidence is still limited to a financial-only Trust Lite signal, price trend argues for patience, and recent execution is mixed.
Fundamental lens: valuation, quality, growth, balance sheet, and cash flow.
Revenue +6.6% · PAT +69.2% YoY
Price trend and sector-relative-strength timing.
Legacy margin-of-safety estimate; the revised evidence label remains in shadow validation.
Financial-only signal; management claim evidence is not sufficient yet.
Fundamentals, quarterly history, margins, returns and balance-sheet evidence
Rev +7% YoY · PAT +69% YoY · margin expansion · operating leverage
| Metric | This quarter | YoY | QoQ |
|---|---|---|---|
| Revenue | ₹371 Cr | +6.6% | -16.4% |
| EBITDA | ₹136 Cr | +72.2% | -2.2% |
| Operating margin | 37.0% | +1400 bps | +600 bps |
| PAT | ₹88 Cr | +69.2% | -5.4% |
| PAT margin | 23.7% | +878 bps | +277 bps |
NDF means not disclosed in the current structured filing feed. It is intentionally not treated as zero.
Updated 21/10/2026
Trend interpretation, Stage 2, relative strength, volume and indicator evidence
Trend is weak — long-term trend down. RSI 33.
Mechanical read from the price + indicator series above. Not a recommendation — technical setups can reverse without warning, especially around earnings and macro events.
U-Score 31 · legacy U-Score band OVERVALUED · valuation evidence and comparable companies
Top U-Score contributors and drags from the latest stored fundamentals.
Cyclical companies can look cheapest near peak profits, so IndiaPulse flags value-trap risk separately.
This shows the stored score trend when snapshots exist, and also compares the latest stored nightly score with a live recompute from current fundamentals and price.
12 stored score snapshots. Latest stored move: +0 points.
Business-comparable peers in Metals — ranked by industry, sub-sector, theme-tag overlap, market cap, and U-Score similarity. Green cells mark the best available peer metric in this table.
Growth engines, risks, management commitments and evidence-backed delivery
MOIL reports mixed 9M FY25-26 results: Manganese ore production increased 6.7% YoY, but revenue from operations declined 8.3% YoY, and PAT fell 34.3% YoY, impacted by a 5.9% drop in Net Sales Realization (NSR). Q3 FY25-26 also saw a 16.8% QoQ PAT decline.
Despite an increase in manganese ore production, MOIL's financial performance for 9M FY25-26 and Q3 FY25-26 is under stress due to declining revenue, PAT, and Net Sales Realization. While long-term demand for manganese ore is supported by India's steel production targets, current operational challenges and pricing pressures are concerning.
MOIL aims to produce 3.5 million MT of Manganese Ore by 2030.
Target to increase MOIL’s market share from 20% to 32% by 2030.
Establish new beneficiation plants and promote briquetting to upgrade low-grade ore and convert fines into salable products.
Explore and expand overseas markets to facilitate the evacuation of accumulated low-grade inventory and unlock additional revenue streams.
Current EC limit is 36.33 lakh tonnes, with a target to expand to 50.0 lakh tonnes by FY29-30.
Projects at Dongri Buzurg (Production, East & West Ventilation), Kandri Mine, and Chikla Mine are planned for completion between 2029 and 2030.
New projects are underway in GMDC, Gujarat; Bhudkum Block (Chhindwara) and Selva Block (Balaghat) in Madhya Pradesh; and Nilkanthpur block (Balrampur) in Chhattisgarh.
India’s steel production target of 300 million MT by 2030 is expected to require 11 million MT of Manganese ore.
Drilling was suspended in the Nilkanthpur block, Chhattisgarh, due to local issues.
GMDC claims a deemed lease based on past dump production, but the MMDR Amendment 2021 states reservation lapses if no lease is granted in 5 years.
Issuer guidance and extracted claims are tracked against later reported outcomes. Treat these as management statements, not IndiaPulse forecasts.
YoY comparison is crucial for assessing annual trends and overall growth, especially for a mining company. QoQ comparison is important to gauge sequential momentum and recent operational efficiency, particularly given the observed decline in financial metrics.
14.21 lakh MT, up from 13.31 lakh MT in 9M FY24-25.
10.84 lakh MT, down from 11.40 lakh MT in 9M FY24-25.
Rs 1056.02 crores, down from Rs 1151.55 crores in 9M FY24-25.
Rs 174.87 crores, down from Rs 265.99 crores in 9M FY24-25.
Most retained profit is used for mechanization, modernization, and capacity enhancement through Capex, with last year's Capex exceeding PAT.
Higher exploration efforts are underway to add to reserves/resources, with 107,530 meters explored in FY24-25, adding 16.07 million tonnes of Mn resource.
Management is focused on expanding business operations into other states.
| Checkpoint | Current evidence | What to verify next |
|---|---|---|
| Manganese Ore Production | 14.21 lakh MT (9M FY25-26) | Progress towards the 3.5 million MT production target by 2030. |
| Revenue from Operations | Rs 1056.02 crores (9M FY25-26) | Improvement in realizations and overall revenue growth to reverse the current decline. |
| Profit After Tax (PAT) | Rs 174.87 crores (9M FY25-26) | Recovery in profitability, especially given the significant YoY decline. |
| EC Limit Expansion | 36.33 lakh tonnes | Approvals and tangible progress towards the targeted 50.0 lakh tonnes EC limit by FY29-30. |
Verification checkpoints are IndiaPulse research interpretation, not investment advice.
Trust asks: does management behaviour match later outcomes? Higher is better, but confidence and evidence depth matter as much as the number.
Limited evidence: Claim history is still being built. It ranks around the 83rd percentile of the scored universe and 87th percentile within Metals. Main check: financial discipline is weak at 50/100.
This is a financial-behaviour screen, not a claim-tested management reliability verdict.
Financial behaviour is scored, but management claims do not yet have enough outcome checks.
overall median 67 · Metals: 87th pctile, median 70 · Micro: 70th pctile, median 73
29 documents have extracted text, but claim history is not strong enough yet.
0 claims extracted · No contradicted claim yet
Read Trust alongside U-Score, result consistency, and technical trend. A cheap stock with weak Trust needs a larger margin of safety; a high Trust score does not make an expensive stock attractive by itself.
Read low sub-scores as due-diligence warnings, not automatic sell signals.
Trust Lite uses financial behaviour only. Prefer claim-tested Trust when enough concall claims have later outcomes.
Latest exchange and company disclosures found within the past two years.
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse