Announcement under Regulation 30 (LODR)-Newspaper Publication 25 Sep - Newspaper Advertisement regarding dispatch of Postal Ballot Notice
Source: Bse
Metals stocks · Large cap · NSE
LMEL is building world-class assets in steel manufacturing, revolutionising iron ore mining and beneficiation, aligning with the nation's steel production goals. It aims to create an economic powerhouse at Chandrapur & Gadchiroli, Maharashtra, and is expanding into copper and cobalt mining in the DRC.
SMA20 +1.0% / mo · MACD +
Latest mapped FPI equity flow was not positive. View sector evidence
Adjusted completed-session prices, rebased to 100
Investable fundamentals, management evidence is still limited to a financial-only Trust Lite signal, price trend is neutral, and recent execution is consistent.
Fundamental lens: valuation, quality, growth, balance sheet, and cash flow.
Revenue +208.5% · PAT +170.1% YoY
Price trend and sector-relative-strength timing.
Legacy margin-of-safety estimate; the revised evidence label remains in shadow validation.
Financial-only signal; management claim evidence is not sufficient yet.
Fundamentals, quarterly history, margins, returns and balance-sheet evidence
Rev +208% YoY · PAT +170% YoY · margin expansion · +22% QoQ
| Metric | This quarter | YoY | QoQ |
|---|---|---|---|
| Revenue | ₹7,354 Cr | +208.5% | +22.2% |
| EBITDA | ₹2,781 Cr | +250.3% | +9.3% |
| Operating margin | 38.0% | +500 bps | -400 bps |
| PAT | ₹1,734 Cr | +170.1% | +13.3% |
| PAT margin | 23.6% | -335 bps | -184 bps |
NDF means not disclosed in the current structured filing feed. It is intentionally not treated as zero.
Updated 20/10/2026
Trend interpretation, Stage 2, relative strength, volume and indicator evidence
Trend is undirectional — long-term uptrend intact. RSI 46.
Mechanical read from the price + indicator series above. Not a recommendation — technical setups can reverse without warning, especially around earnings and macro events.
U-Score 62 · legacy U-Score band UNDERVALUED · valuation evidence and comparable companies
Top U-Score contributors and drags from the latest stored fundamentals.
Cyclical companies can look cheapest near peak profits, so IndiaPulse flags value-trap risk separately.
This shows the stored score trend when snapshots exist, and also compares the latest stored nightly score with a live recompute from current fundamentals and price.
12 stored score snapshots. Latest stored move: +0 points.
Business-comparable peers in Metals — ranked by industry, sub-sector, theme-tag overlap, market cap, and U-Score similarity. Green cells mark the best available peer metric in this table.
Growth engines, risks, management commitments and evidence-backed delivery
LLOYDSME reported highest ever quarterly/yearly Revenue, EBITDA, and PAT on a standalone basis for Q4 & FY26. Consolidated Total Income grew 155% YoY to INR 1,73,064 Mn in FY26, driven by higher iron ore EC limits, pellet plant ramp-up, and improved sponge iron volumes.
The company delivered robust FY26 results, driven by strong volume growth across segments and margin expansion from operating leverage and product mix improvement. Significant capacity additions and new ventures in copper and cobalt, alongside strategic partnerships, position it for continued growth, though execution and rising debt warrant monitoring.
Latest issuer-disclosed distribution across 3 reported categories.
Environment Capacity increased from 10 MTPA to 55 MTPA for Gadchiroli operations. FY27 production target is 26 MnT.
2nd Pellet Plant (4 MnT) commissioned in May-26. FY27 guidance for pellet production is 7.75-8 MnT.
Commercial production of copper cathodes from 12,000 TPA plant commenced March 2026. Acquired 49% stake in Chemaf Group for copper-cobalt.
Construction work for 1.2 MnT steel plant has started and is expected to be on time.
4 MnT capacity commissioned in May-26, completed in 16 months from construction start.
12,000 TPA plant in Surya Mines commenced commercial production in March 2026.
DRI plant at Ghughus is commissioned.
New 195 kms, 16 MnT capacity slurry pipeline from Hedri to Ghughus. Construction to start in Q4FY26, expected commissioning in FY27.
Robust domestic demand for iron ore and pellets supported volume growth across segments.
Commissioning of slurry pipeline enabled smoother evacuation of iron ore, improving throughput and asset utilization, leading to robust margins for pellets.
LMEL mines are valid till year 2057, making them prominent miners beyond CY30 and ensuring raw material security.
MoU signed to explore strategic collaboration across iron ore mining, pellet manufacturing, slurry pipeline infrastructure, and steelmaking.
Plans to scale down Indonesian operations due to lower margins and operational issues, proposing to shift equipment to Congo or PNG.
Consolidated finance costs increased 1,776% YoY in FY26 to INR 5,104 Mn, indicating rising debt burden.
Multiple large-scale projects (steel, copper, cobalt, pipelines) require timely execution, commissioning, and utilization ramp-up to realize expected benefits.
Exposure to global copper and cobalt prices, and domestic iron ore/steel prices could impact realizations and profitability.
Issuer guidance and extracted claims are tracked against later reported outcomes. Treat these as management statements, not IndiaPulse forecasts.
YoY comparison is crucial for assessing the significant growth in Q4 and full-year FY26 financials and operational volumes. QoQ is important for tracking sequential momentum, especially for new capacities like the pellet plant achieving 100% utilization and new project commissioning.
INR 1,73,064 Mn, up 155% YoY.
INR 63,339 Mn, up 215% YoY.
36.60%, expanded 694 bps YoY.
21.96 MnT, up 120% YoY.
Roadmap towards BHQ beneficiation, pellets, DRI, steel, copper, and cobalt, with significant capacity expansions planned across verticals.
Slurry pipelines and captive logistics are expected to deliver over INR 2,000 crore annual savings as initiatives mature.
Clear pathway to expand copper capacity to 30,000 TPA at Surya Mines, with longer-term ambition of 100,000 TPA; cobalt capacity to ~20,000 TPA.
MoU with Tata Steel aims to leverage complementary strengths, promote sustainable growth, and build a scalable, integrated steel value chain.
| Checkpoint | Current evidence | What to verify next |
|---|---|---|
| Pellet Production | 3.03 MnT (FY26) | 7.75-8 MnT (FY27 guidance) and sustained 100% utilization of new plants. |
| Iron Ore Production | 21.96 MnT (FY26) | 26 MnT (FY27 guidance) and ramp-up towards 55 MTPA EC limit. |
| DRC Copper Production | Commercial production commenced March 2026 | 10,000 tonnes (CY26 estimated) and 15,000 tonnes (CY27 estimated) production targets. |
| Slurry Pipeline Commissioning | Hedri to Konsari (85 kms) operational | Commissioning of the 195 kms Hedri to Ghughus pipeline in FY27 and associated cost savings. |
Verification checkpoints are IndiaPulse research interpretation, not investment advice.
All upcoming projects are expected to have a payback period of less than 4 years.
"All upcoming projects are expected to have a payback less than 4 years"
All upcoming projects are expected to have a payback period of less than 4 years.
"All upcoming projects are expected to have a payback less than 4 years"
LMEL is forward integrating into 12 MNT Pellet and 4.2 MNT Steelmaking.
"Forward Integrating into 12 mnt Pellet and 4.2mnt Steelmaking"
LMEL is forward integrating into 12 MNT Pellet and 4.2 MNT Steelmaking.
"Forward Integrating into 12 mnt Pellet and 4.2mnt Steelmaking"
Iron ore saleable/processed capacity will expand from 10 MNT to 25 MNT.
"Iron Ore (saleable/processed) Existing 10 MNT Post Expansion 25 MNT"
Outcome check: Revenue YoY averaged -17.8% across 2 later quarter(s).
Iron ore saleable/processed capacity will expand from 10 MNT to 25 MNT.
"Iron Ore (saleable/processed) Existing 10 MNT Post Expansion 25 MNT"
All expansion plans are drawn without resorting to debt.
"All the expansion plans are drawn without resorting to debt"
All expansion plans are drawn without resorting to debt.
"All the expansion plans are drawn without resorting to debt"
Trust asks: does management behaviour match later outcomes? Higher is better, but confidence and evidence depth matter as much as the number.
Limited evidence: Management has 0% delivered/partly-delivered outcomes on 1 checked claims, with 1 adverse claim outcome. It ranks around the 75th percentile of the scored universe and 75th percentile within Metals. No major sub-score weakness stands out.
This is a financial-behaviour screen, not a claim-tested management reliability verdict.
Financial behaviour is scored, but management claims do not yet have enough outcome checks.
overall median 67 · Metals: 75th pctile, median 70 · Large: 55th pctile, median 73
72 documents have extracted text, but claim history is not strong enough yet.
1/4 claims checked · 1 contradicted/failed claim
Read Trust alongside U-Score, result consistency, and technical trend. A cheap stock with weak Trust needs a larger margin of safety; a high Trust score does not make an expensive stock attractive by itself.
Read low sub-scores as due-diligence warnings, not automatic sell signals.
Trust Lite uses financial behaviour only. Prefer claim-tested Trust when enough concall claims have later outcomes.
Latest exchange and company disclosures found within the past two years.
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse
Source: Bse